Site Accommodation Hire - Siemens Energy Services Case Study

Rapid response from Konstructa Hire delivers office and welfare facilities within days of order, just in time for maintenance shutdown

Organisation : Siemens Energy Services

Application : SITE ACCOMMODATION


Location : Cottam Power Station, Nottinghamshire

Requirement :

When the planned maintenance shutdown at Cottam Power Station was brought forward at short notice, Siemens Energy Services had just four weeks – rather than the usual five months – to get everything ready to service the plant. That meant sourcing all the manpower, resources and spare parts needed, as well as setting up a complete on-site office and welfare compound for site-based engineers and supervisors.

Solution :

Siemens Energy Services has a preferred supplier agreement with site accommodation provider Konstructa Hire, awarded for the high quality of its site buildings and exceptional performance on previous projects. Siemens contacted Konstructa Hire, asking for ten buildings to be installed at the power station within two weeks.

Simon Higgs, Business Development Manager for Konstructa Hire, says: “As soon as Siemens requested the buildings, we set about getting them ready. By the time the order was placed, on a Friday, we had to get the buildings on site the following Monday. Thanks to our earlier preparation, everything was ready to be delivered and installed on schedule, ensuring we lived up to our on-time delivery promise .”

Stephen Perry, Site Services Supervisor at Siemens Energy Services, says: “All the site buildings we needed were set up in time for the start of the maintenance programme, which was quite an achievement given the tight turnaround. Once work started on site, it soon became clear that we needed extra office capacity, and Konstructa Hire responded immediately by installing two more buildings.”

Konstructa Hire provided ten 32-foot units initially, configured as a two-storey building due to limited space on site. The ground floor provided mess room accommodation, while the upper floor comprised three office units and two locker rooms. Two additional office units were added later, creating a separate two-storey building.

Stephen adds: “The Konstructa Hire team were very responsive and flexible throughout the contract, and were able to extend the hire period beyond the initial nine-week agreement when final commissioning took longer than planned.

“Everyone was pleased with the quality of the buildings, which were robust and spacious. The integral water boilers in the mess rooms were a useful extra feature, which we hadn’t come across before.”

 





Quicklinks

Free Downloads

Contact Us


Snel-Contact

Portakabin (Site Accomodation) Limited
Yorkon House
New Lane
Huntington
York
YO32 9PT

  • SGS
  • BSI
  • UKAS
  • Government Procurement Service
  • Konstructa

Calls to 0845 numbers will be charged at 5p per minute plus your phone company's access charge.

©
Portakabin 2017  |  Portakabin (Site Accomodation) Limited, Yorkon House, New Lane, Huntington, York, YO32 9PT  |  Tel 0845 355 3443  Fax 0845 355 5444
Registered company number 5900419